Evolution of net installed capacity since 1898
Date of last available data: July 31, 2019
Note: Net installed capacity does not consider the “Los Lagos” (7 MW) and “Easter Island” (4 MW) systems. Nor is the Gas Natural plant located in Salta (Argentina), interconnected to the SING (380 MW).